Skip to content

PROTECTING YOUR WORLD

Start a Concrete
Business: Costs
by Service Line

Flatwork, stamped, foam lifting, coatings and sealing compared on startup cost, equipment, licensing, pricing and seasonality, with two calculators. All sourced.
Business Opportunity

Pouring concrete now, or about to? Add lifting and coatings with ArmorThane.

Tell us where you work and what you pour. We'll walk you through our LIFT foams, polyurea and floor coating systems, the equipment and on-site training, with no franchise fee and no royalty.

  • No franchise fee, dealership fee or royalty
  • On-site or virtual training ending in certification
  • Turnkey applicator systems from $25,000
  • Third-party equipment financing and a 24/7 tech line
Rather talk now? Call (417) 831-5090
Name
$6–$10
Per sq ft for a standard concrete driveway
HomeGuide
$7–$17
Per sq ft, typical foam slab lifting
ArmorThane cost guide, 2026
≈$10,900
Core flatwork finishing kit, new
Our total of September 2026 retail prices
$27.41/hr
Median wage, concrete finishers
O*NET, 2025 data

Most concrete companies start with a screed, a power trowel and a few driveways. Plain flatwork is weather-bound and material-heavy, so many owners look at services that reuse the same customers and truck: stamped work, slab lifting, sealing and coatings. This guide compares those lines on startup cost and earnings, so you can plan the mix before you buy gear.

Quick answer

To start a concrete business, choose your service lines, get licensed and insured, and buy only the gear those lines need. A core flatwork finishing kit costs about $10,900 new, a floor-coating grinding kit about $12,300 and a new foam lifting rig $50,000–$80,000. Customers pay about $6–$10 per sq ft for a standard driveway, $8–$26+ for stamped and $7–$17 for foam lifting. Build your startup budget or compare a pour with a lift.

We make polyurethane lifting foams, polyurea and floor coatings, and we train independent applicators, many of whom already pour concrete. We'd like you to add our systems one day. We'll still give you the flatwork numbers straight, because the right first service depends on your market, not on what we sell.

The first decision

Choose your service lines

"Concrete business" covers very different companies. A flatwork crew lives on ready-mix, labor and good weather. A lifting crew drills 5/8-inch holes and injects foam from a trailer. A coating crew grinds and rolls. Here's how the common lines compare on published numbers.

Service lineStartup kitWhat customers payTypical jobSeason and repeat work
Flatwork and driveways≈$10,900 finishing kit, plus forms and a truck$6–$10 per sq ft (standard driveway)2-car driveway, 400 sq ft: $2,400–$6,000Weather-bound pours; ACI publishes a separate guide to cold-weather concreting
Stamped and decorativeFlatwork kit plus stamp mats (get quotes)$8–$13 basic, $13–$19 mid, $19–$26+ high-end per sq ft12×12 patio: $1,150–$2,750Same season as flatwork; resealing every 2–3 years
Foam concrete lifting$50,000–$80,000 new rig (≈$49,000 starter)$7–$17 per sq ft typical; HomeGuide lists $8–$25$600–$5,000+; national average about $1,235Lift 300 is rated for cold, damp ground; northern crews report 6–8 busy months
Floor coatings≈$12,300 grinding and testing kit$4–$12 per sq ft2-car garage: $1,600–$4,800Mostly garages, shops and basements
SealingSprayer and rollers; sealer $0.10–$0.75 per sq ft$1.35–$2.50 per sq ft1,000 sq ft: about $1,500Reseal every 1–5 years depending on wear
Crack injectionInjection gear (pro prices not published); DIY kits $99–$473$250–$800+ per crackPer crackIndoor work on basement walls
Customer prices from HomeGuide (driveways June 2025, stamped Dec. 2025, mudjacking Nov. 2025, crack repair July 2025, garage floor coating Dec. 2024), Angi (sealing, July 2026) and ArmorThane's concrete leveling cost guide (Sept. 2026, citing HomeAdvisor's $1,235 average). Kit totals are our arithmetic from retail listings read September 27, 2026. Lifting rig and job range from LevelRight Marketing (Jan. 2026).

Material as a share of the price

One quick way to see where the margin room is: compare what the material costs with what the customer pays. These are midpoints of the published ranges, so treat them as rough.

Flatwork driveway (materials $3–$8 of $6–$15)
≈52%
Stamped (concrete $2–$6 of $8–$19)
≈30%
Floor coating (≈$2 of $4–$12)
≈25%
Sealing ($0.10–$0.75 of $1.35–$2.50)
≈22%
Foam lifting (≈$0.60 of $7–$17)
≈5%

Our arithmetic. Flatwork and stamped use HomeGuide's per-sq-ft breakdowns (stamping and coloring, $3–$4, is listed separately). Foam assumes a 1-inch average void, 2.5 lb per cubic foot foam, a 25% allowance and about $2.30 per pound (HMI).

Low material cost isn't profitFoam lifting's small material share is offset by a $50,000-plus rig and the marketing needed to keep it busy. Flatwork is the reverse: cheap to equip, expensive in concrete and labor.
Equipment

Equipment and startup cost by service line

Start with flatwork, since every other line on this page rides on it. You don't need a batch plant or a mixer truck; ready-mix suppliers deliver. You need tools to place, strike off, compact, finish and joint the slab. Here's the core kit at September 2026 retail prices.

ItemExamplePriceNotes
36 in walk-behind power trowelWhiteman J Series, Bartell BC436$2,498–$2,728 (Marshalltown $4,045)46 in models $3,253–$4,664
Power screedHusqvarna BV 20 G, Wyco Screed King$1,693–$2,999Strikes off wider pours faster than a hand screed
Plate compactorBartell BCF2150H, Wacker WP1550A$2,693–$2,825Reversible models from $3,263
Walk-behind sawHusqvarna FS309 (14 in)$2,469 (20 in: $2,879)Early-entry Soff-Cut 150: $3,119
Portable mixerImer Minuteman II$950–$1,859Or rent for about $120 a day
Ready-mix, delivered3,000 psiAbout $124 per yd³Short loads under 10 yd³: +$53 per yd³
Pumping (as needed)Trailer pump or boom truck$15 per yd³ ($125 min) or $140–$190 an hourBoom trucks carry a 4–5 hour minimum
Equipment prices from Contractors Direct, read September 27, 2026. Ready-mix, pumping and rental figures from HomeGuide's concrete price guide (Jan. 2026).

The trowel, screed, compactor, 14-inch saw and mixer come to about $10,871 new. Add hand tools, forms, a truck and a trailer, which vary too much to price here.

The other lines

Stamped work adds stamp mats, texture skins, color and release; we couldn't verify a current stamp-set price, so get quotes. Foam lifting needs a rig, $50,000–$80,000 new per LevelRight Marketing, and HMI runs a two-day seminar for $595. Floor coatings need a grinder, HEPA extractor, hand grinder and moisture meter, about $12,300 new; see our floor coating business guide. Sealing needs little more than a sprayer and rollers.

Interactive tool 1 of 2

Startup cost builder

Tick the service lines you'll open with and change any amount to match your own quotes. Defaults come from the prices above; insurance uses Insureon's national medians.

Startup budget

What will my service mix cost to open?

Each line's amount covers its equipment, training and first material. Vehicle and marketing are yours to adjust.

Service lines to open with
Trowel, screed, compactor, saw, mixer
Enter your supplier quote
Rig, seminar, first foam
Grinding kit, training, material
ArmorThane turnkey, from $25,000
3 months at $800 (LevelRight example)
Insurance to include (Insureon medians)
$67,122
Estimated startup
$62,766
Service-line equipment and training
$4,356
Insurance, marketing and vehicle

The money

What customers pay and where the margin is

Price from your costs, then check the result against what the market pays. The formula floor coaters learn from Xtreme Polishing Systems works for any concrete job: bid = (materials + labor + consumables + trip) ÷ (1 − (overhead % + profit %)). Overhead and profit are shares of the price, not markups on cost, which is where many new contractors underbid.

Flatwork

$6–$10 per sq ft

HomeGuide's standard driveway range, with labor at $3–$7 and materials $3–$8 per sq ft. Removal adds $2–$6, grading $3–$8 and rebar $1–$3 per sq ft. Permits run $50–$200.

Stamped

$8–$26+ per sq ft

Basic one-pattern work starts at $8–$13; multi-color custom work tops $19. Stamping and coloring adds $3–$4 per sq ft, and customers reseal every 2–3 years at $1–$3 per sq ft.

Foam lifting

$7–$17 per sq ft

Typical 2026 band in our concrete leveling cost guide, with a published range of $5–$25. Minimum charges run $300–$700. HMI budgets $200–$300 of foam on a typical job.

Floor coatings

$4–$12 per sq ft

A polyurea base, flake and polyaspartic top runs about $2 per sq ft in material. One franchise disclosure shows roughly 48% gross profit after labor and materials.

Sealing

$1.35–$2.50 per sq ft

Angi's installed range; material is $0.10–$0.75 per sq ft. A 1,000 sq ft job averages about $1,500, and customers reseal every one to five years.

Crack injection

$250–$800+ per crack

HomeGuide's range for injected foundation cracks. It pairs naturally with lifting and waterproofing calls.

Add-on services sell for several times their material cost and reuse customers you already have. The trade-off is equipment for lifting and skill for stamping and coatings. Get new pricing guides and cost updates by email: join the ArmorThane newsletter.

Interactive tool 2 of 2

Pour vs. lift job calculator

A sunken driveway can be torn out and repoured or, if it's sound, lifted. Enter the slab once and see both jobs side by side: the flatwork bid from your costs, and the foam job at a market price. The $220 "fixed costs per lift" default spreads HMI's equipment-financing estimate (about $90 a working day), LevelRight's $800-a-month ad example and $326 a month of insurance over 12 jobs a month.

Job comparison

Replace it or lift it: what does each job earn?

Defaults: a 20 × 20 ft driveway, 3,000 psi ready-mix at HomeGuide's price, O*NET's median finisher wage and ArmorFoam Lift 200's density.

Ready-mix short load
5.4 yd³
Concrete to order
$2,119
Pour: direct cost
$3,260
Pour: bid
$8.15
Pour: bid per sq ft
104 lb
Foam to inject
$724
Lift: direct cost
$3,200
Lift: price
77%
Lift: margin

Concrete lifting business

Adding foam concrete lifting

Polyurethane lifting (polyjacking) raises a settled slab by injecting two-part foam through small drilled holes. It's the natural add-on for a flatwork company: the same homeowners who call about a new driveway also have a sunken sidewalk, patio or garage floor. Our foam concrete lifting page explains the method, and mudjacking vs. polyjacking compares it with cement slurry.

Polyjacking equipment

LevelRight Marketing lists what goes into a trailer rig:

  • Enclosed trailer or box truck
  • Generator (10 kW or larger) and air compressor
  • Proportioner pump (Graco and PMC are named)
  • 100–200 ft of heated hose and an injection gun
  • Transfer pumps, drill bits and hand tools

New complete rigs run $50,000–$80,000 in that guide. Foam is the small line: HMI prices it at about $2.30 a pound and budgets $200–$300 of chemical per typical job.

Mudjacking or foam?

MudjackingFoam
Price per sq ft$3–$7 (HomeGuide $4–$9)$7–$17 (HomeGuide $8–$25)
Material weight100–125 lb/ft³2.5–3.75 lb/ft³
Hole size1½–2 inAbout ⅝ in
Back in useAbout 24 hoursDrive on within 30 minutes
ArmorThane's mudjacking vs. polyjacking and leveling cost guides (Sept. 2026), HomeGuide (Nov. 2025).
Residential

ArmorFoam Lift 200

Two-component, closed-cell, water-blown slab-jacking foam at 2.50 lb/ft³ for residential concrete or asphalt. Hydrophobic, and it can be driven on within 30 minutes or less. Lift 200 details.

Commercial

ArmorFoam Lift 300

A 3.75 lb/ft³ version for commercial and industrial slabs. ArmorThane rates it for all climate zones and for injection into cold, damp or wet ground. Lift 300 details.

Treat income projections with care. One equipment seller models four jobs a day and a roughly 70% net margin; a marketing agency illustrates about $500 net on a $2,000 job and breakeven in year two. Your lead flow decides which is closer.

Price a lifting setupAlready pouring and want to add lifting? Tell us about your market in the business inquiry form at the top of this page, and we'll talk through LIFT foams, equipment and training.
More from every pour

Adding coatings, sealing and crack repair

Coatings turn a one-time pour into follow-up work. You already have the customer's trust and the slab's history. Here's how each add-on fits a concrete company.

Low startup

Sealing

Offer it at handover and on a schedule. Stamped customers reseal every 2–3 years and plain concrete every one to five, per HomeGuide and Angi. See our concrete driveway sealer page for polyurea options.

≈$12,300 kit

Garage and shop floor coatings

Grinding, moisture testing and a flake system. It's a separate skill with its own callbacks, covered step by step in our floor coating business guide.

Per crack

Crack injection

Injecting basement wall cracks sells at $250–$800+ per crack. Our polyurea crack injection page covers the method and foundation crack repair covers when a crack is structural.

From $25,000

Spray polyurea

Patios, pool decks, walls and containment. ArmorThane turnkey applicator systems start at $25,000. Prep decides the result; read prepping concrete for spraying first.

Paperwork and safety

Licensing, insurance and silica rules

Licensing is set by your state and often your city. California's C-8 Concrete classification covers contractors who "form, pour, place, finish and install" flat and other concrete work, and since January 1, 2025, unlicensed work there is capped at $1,000 and only where no permit is needed and no one is employed. Arizona requires a license when labor and materials exceed $1,000 or a permit is required. Driveway permits themselves run $50–$200 in HomeGuide's data. Check your state contractor board and city before your first bid.

For insurance, we couldn't read a concrete-specific survey, so here are Insureon's August 2026 medians for flooring installers, the closest class we could verify: general liability about $77 a month, a business owner's policy $115, workers' comp $144, commercial auto $208 and tools and equipment $41. Concrete rates may differ with payroll and claims, so get quotes.

OSHA's silica rule, by task

Cutting joints, drilling lift holes and grinding all make respirable crystalline silica. OSHA's standard (29 CFR 1926.1153) sets a 50 µg/m³ eight-hour limit, and its Table 1 lists the controls for each tool.

Flatwork

Walk-behind saws

An integrated water system that feeds the blade continuously. No respirator outdoors; APF 10 indoors or in enclosed areas.

Flatwork

Handheld power saws

Integrated water. Outdoors, no respirator up to four hours a shift and APF 10 beyond that; APF 10 indoors.

Lifting

Drills, including rotary hammers

A shroud or cowling with a dust collector (99% filter efficiency) and a HEPA vacuum to clean holes. No respirator required.

Coatings

Floor grinders

Water, or a dust collector with a 99%-efficient filter and a filter-cleaning mechanism. No respirator required when controls are followed.

Year-round work

Seasonality, crews and wages

Flatwork follows the weather. Cold slows curing and needs protection (ACI publishes a guide to cold-weather concreting), rain stops pours, and ready-mix plants set their own schedules and Saturday surcharges. A multi-line company can fill the gaps. LevelRight Marketing reports northern lifting crews work a six-to-eight-month heavy season, and ArmorThane rates Lift 300 for injection into cold, damp or wet ground. Coating work is mostly indoors. Resealing schedules bring customers back every few years.

Wages

$27.41 an hour

O*NET's 2025 median for cement masons and concrete finishers, or $57,020 a year. Add payroll taxes and workers' comp to get your true labor cost.

Workforce

206,700 finishers

U.S. employment in 2024, with growth projected at 1–2% through 2034, slower than average. Good finishers are worth keeping busy all year.

Training

Days to a year

O*NET rates the work at a few days to a year of on-the-job training, with registered apprenticeships available.

Getting going

A 90-day launch plan

  1. Weeks 1–2: pick the mix

    Decide your lead service and one add-on. Run the startup builder with your own quotes and the job calculator with local ready-mix prices.

  2. Weeks 2–4: register, license, insure

    Form your business entity, register with your state and city, and get the license your state requires. Buy general liability before you bid.

  3. Weeks 3–6: equip and train

    Buy or rent the flatwork kit. Book training for any add-on line, whether that's a lifting seminar or coating certification.

  4. Weeks 5–8: first jobs and photos

    Pour a few small slabs and sidewalks at fair prices. Photograph every step; those photos sell the next job.

  5. Weeks 8–12: marketing that pays

    A Google Business Profile, a simple website and a modest ad budget. LevelRight's example spends $800 a month on Google and Facebook, with Facebook leads at $20–$40 each.

Contractors and technicians standing around an ArmorThane Mobile Coatings Unit trailer
Hands-on training with an ArmorThane mobile coatings unit.
ArmorThane opportunity

Pour, lift and coat, under your own name

ArmorThane has trained and supplied independent applicators since 1989, with applicators in more than 50 countries. We make the Lift 200 and Lift 300 slab-jacking foams, polyurea and floor coatings, and there's no franchise fee, no dealership fee and no royalty. Training is on site or virtual and ends in certification, and you'll have a 24/7 tech line afterward.

New applicator systems start at $25,000 turnkey, including equipment, training, first chemical, prep and safety gear, and low-pressure 1:1 equipment starts as low as $20,000. Third-party equipment financing is available. Homeowners reading this can use our applicator finder to find a certified applicator nearby, and everyone can get new guides through the ArmorThane newsletter.

Technicians receiving hands-on coatings machine training
Hands-on training at ArmorThane.
For concrete contractors

Already pouring? Add protective coatings.

Concrete contractors are one of the trades ArmorThane works with to add coatings. We supply the systems and train your crew, with no franchise fee and no royalties, so the coating work carries your name.

Starting from scratch? See how to start a floor coating business →

Straight answers

Concrete business FAQ

How much does it cost to start a concrete business?

It depends on the services you open with. A core flatwork kit (36-inch power trowel, power screed, plate compactor, walk-behind saw and portable mixer) costs about $10,900 new at September 2026 retail prices, before forms, hand tools and a truck. Adding foam lifting means a rig that LevelRight Marketing puts at $50,000–$80,000 new. A floor-coating grinding kit is about $12,300. Budget insurance, licensing and a few months of marketing on top.

What equipment do I need to start a concrete business?

For flatwork: forms and hand tools, a power screed ($1,693–$2,999), a walk-behind power trowel ($2,498–$4,664), a plate compactor ($2,693–$2,825), a walk-behind saw with water feed for control joints ($2,469 and up) and a truck. Ready-mix suppliers deliver the concrete, so you don't need a mixer truck. Many new crews rent the compactor and mixer until the work is steady.

Do I need a license to start a concrete company?

In most places, yes, but the rules are set by your state and often your city. California's C-8 Concrete classification covers forming, pouring, placing and finishing flatwork, and unlicensed jobs there are capped at $1,000 with no permit or employees. Arizona requires a license when labor and materials exceed $1,000 or a permit is needed. Check your state contractor board before you bid.

How much insurance does a concrete contractor need?

Start with general liability, add commercial auto for your truck and tools coverage for your equipment, and add workers' comp once you hire. We couldn't read a concrete-specific survey, but Insureon's August 2026 medians for flooring installers are a reasonable first budget: about $77 a month for general liability, $144 for workers' comp, $208 for commercial auto and $41 for tools and equipment. Get quotes for your state.

How much do concrete contractors charge per square foot?

HomeGuide lists $6–$10 per sq ft for a standard concrete driveway and $5–$10 for a plain slab. Stamped concrete runs $8–$13 basic, $13–$19 mid-range and $19–$26+ high-end. Foam slab lifting typically runs $7–$17 per sq ft in our cost guide, with HomeGuide listing $8–$25. Sealing runs $1.35–$2.50 per sq ft installed, per Angi.

How profitable is a concrete business?

Flatwork is material-heavy: by our arithmetic from HomeGuide's breakdown, materials are roughly half the price of a driveway, so margin depends on labor efficiency and pricing. Use the bid formula: direct costs divided by one minus your overhead and profit percentage. Add-on services such as sealing, coatings and foam lifting sell for several times their material cost, though lifting carries rig payments and marketing costs.

Is concrete lifting a good business?

It can be, especially added to an existing concrete company. Jobs are short, material is a small share of the price, and sunken slabs are common. The trade-offs are a $50,000–$80,000 rig and the marketing needed to keep it busy. Vendor projections vary widely: one equipment seller models a 70% net margin, while a marketing agency illustrates about $500 net on a $2,000 job.

What equipment do you need for polyjacking?

A polyjacking rig usually includes an enclosed trailer or box truck, a 10 kW or larger generator, an air compressor, a proportioner pump, 100–200 ft of heated hose, an injection gun, transfer pumps and drill bits. LevelRight Marketing prices new complete rigs at $50,000–$80,000. Drilling lift holes falls under OSHA's silica rule, which calls for a shrouded drill with dust collection.

Should a new company offer mudjacking or polyjacking?

Mudjacking is cheaper for customers, about $3–$9 per sq ft, and uses cement slurry at 100–125 lb per cubic foot through 1½–2 inch holes. Polyjacking sells for more, about $7–$17 per sq ft, uses foam at 2.5–3.75 lb per cubic foot through holes about ⅝ inch wide, and slabs can take traffic within 30 minutes. Foam adds far less weight to the soil and gets the slab back in use faster.

Can a concrete business work year-round?

Flatwork is weather-bound in cold climates, and ACI publishes a separate guide to cold-weather concreting. Adding lines helps: ArmorThane rates its Lift 300 foam for injection into cold, damp or wet ground, coating work is mostly indoors, and sealing customers come back every one to five years. LevelRight Marketing reports northern lifting crews work a six-to-eight-month heavy season.

Should a concrete company add coatings?

It's a common next step because you already have the customers. Garage floor coatings sell for $4–$12 per sq ft with about $2 per sq ft in material for a polyurea, flake and polyaspartic system, and sealing and stamped resealing bring repeat work. ArmorThane trains and supplies independent applicators with no franchise fee, dealership fee or royalty.

AT
ArmorThane Technical Team · Springfield, Missouri
Written from dated cost guides, retail equipment listings read September 27, 2026, OSHA's silica standard, state licensing boards, O*NET wage data, ArmorThane product pages and 35+ years of training independent applicators. Reviewed September 27, 2026.

Methodology and sources

Customer prices are national ranges; local prices vary. Equipment prices are retail listings on the date shown. Kit totals, material shares and the calculators' fixed-cost default are our arithmetic. Rig costs and income examples come from an equipment seller (HMI) and a marketing agency (LevelRight). Insurance uses Insureon's flooring-installer medians as a proxy. This is not financial or legal advice.

  1. HomeGuide, Concrete Driveway Cost (June 2025) and Concrete Cost Per Yard (Jan. 2026): homeguide.com
  2. HomeGuide, Stamped Concrete Cost (Dec. 2025) and Mudjacking Cost (Nov. 2025): homeguide.com
  3. HomeGuide, Foundation Crack Repair Cost (July 2025) and Garage Floor Coating Cost (Dec. 2024): homeguide.com
  4. Angi, How Much Does It Cost to Seal Concrete? (July 2026): angi.com
  5. Contractors Direct, power trowels, screeds, compactors, walk-behind saws and mixers (read Sept. 27, 2026): contractorsdirect.com
  6. LevelRight Marketing, How to Start a Concrete Lifting Business (Jan. 2026): levelrightmarketing.com
  7. HMI, Cost to Start a Concrete Lifting Business in 2026 (Apr. 2026): hmicompany.com
  8. Xtreme Polishing Systems, How To Price Epoxy Jobs (Aug. 2026): xtremepolishingsystems.com
  9. Franchise Chatter, GarageExperts Franchise Review 2026 (July 2026): franchisechatter.com
  10. OSHA, 29 CFR 1926.1153 Respirable crystalline silica: osha.gov
  11. CSLB, C-8 Concrete classification and Industry Bulletin 24-07: cslb.ca.gov
  12. Arizona Registrar of Contractors, License Classifications: roc.az.gov
  13. Insureon, Flooring Installer Insurance Cost (Aug. 2026): insureon.com
  14. O*NET OnLine, Cement Masons and Concrete Finishers 47-2051.00: onetonline.org
  15. American Concrete Institute, ACI 306R-16 Guide to Cold Weather Concreting: concrete.org
  16. ArmorThane, Concrete Leveling Cost (2026); Mudjacking vs Polyjacking (2026); Garage Floor Coating Cost (2026): armorthane.com
  17. ArmorThane, ArmorFoam Lift 200 and Lift 300 product pages (Apr. 2026): armorthane.com
  18. ArmorThane, Start A Protective Coatings Business; Add Protective Coatings To Your Contracting Business: armorthane.com
Concrete Business Newsletter

Grow a concrete business on real numbers.

Startup, pricing and equipment guides for concrete contractors adding foam lifting, coatings and sealing, with dated prices. No franchise pitch.

  • Pricing and startup cost updates
  • Foam lifting and coating how-tos
  • Equipment and training news
Need a price on a project now? Get a free quote or call (417) 831-5090.
Which applications interest you?
Pick all that apply. We only send you what fits.
Optional. Helps us point you to applicators near you.

Pour it, lift it, coat it.

A concrete company that can also lift sunken slabs and coat or seal what it pours sells more to every customer. ArmorThane supplies the foams, coatings, equipment and training, with no franchise fee, dealership fee or royalty.

United States 417-831-5090 · Canada 780-444-6200

CONTACT US

REQUEST A QUOTE OR

BECOME AN APPLICATOR

ArmorThane has built a strong reputation over the past 30 years for producing high-quality, durable protective coatings.

group 115 660555abebfe4
Phone Number

Tel: 417.831.5090

group 115 1 660556c21395c
Email Us

moreinfo@armorthane.com

Step 1 of 3

We want to help you find the best ArmorThane applicator for your protective coating project. Please either fill out the request form below or call us toll free at 417-831-5090, any time Monday-Friday, 8:00 a.m. to 5:00 p.m. Central Standard Time.

RV Find An Applicator

Protective Coating Applications

Products

Applicator Opportunities

Knowledge Center

Galleries